Celmec International

Celmec International was looking for ways to reduce their electricity bills and also lead the way in environmental sustainability for their clients. With a recent focus on energy efficiency and monitoring load consumption of the site, Tim Schilbach, the project coordinator, was seeking a solution with live monitoring and the capability to allow for the addition of more PV in the future.

Solahart Eastern Ranges was selected to design a system to accommodate the needs of Celmec International. Mark Baker and his team, engineered and installed a 29.4kW optimised system, personalised to match the site’s load consumption. The SolarEdge online monitoring portal gave real-time updates and data logging of energy usage on the site. Using this information, Celmec International assesed their electricity usage and performed a renovation of the lighting systems around the office, further reducing their electricity bills.

Yes, I'd like to learn how Solahart can help my business

The following errors were found: